    Hi friends in this article we see material required per 1 Ratio of M 15 is 1:2:4. One part cement : two part sand : four part aggregate . This type of cement is generally used as in . Compressive strength of M 15 = 15 N/mm 2. 1) CEMENT. Calculation of cement quantity in M 15 Concrete. Ratio of M 15 concrete = 1:2:4. Dry weight of concrete is = Density of cement = 1440 kg/ ...

    Get Price
  • cement consumption m15 grade concrete

    Material Use in Concrete? Same as concrete is different parts of one product. All materials name Cement + Sand + Aggregate + Water + Addmixuer a part of concrete. Concrete is defined as a different grade like M15, M20, M25, as per IS Code 456. All concrete Grade different mix designs. All mix design different materials, different positions. Concrete Mix Design Calculation for M15 Grade as per ...

    Get Price
  • Concrete Materials Calculation | M15 Grade Concrete Ratio

    Plain cement concrete comprises of cement, sand and crush aggregates. Suppose, the ratio of cement, sand and aggregates for M15 grade concrete = 1:2:4. 1. Length is given as 15 feet 2. Width is given as 8 feet 3. Height is given as 6 inches or .5 feet. The quantities of materials will be determined with the following formula :

    Get Price
  • material consumption in m15 grade cement concrete

    10/01/2013 · 10/01/2013 · material consumption in m15 grade cement concrete – ... »More detailed. material required for m15 cement concrete – Rev. # 00 Doc. # BMT/F/01/02 GERI – Web Site Of GERI. 2 Grade of Concrete: M15 / M20 / M 25 / M30 / M35 (As per IS 456 . Required quantity in full bag cement . »More detailed. Concrete Mix Design Calculations – Civil Engineering .

    Get Price
  • Construction Board: Rate Analysis of M15 Concrete

     · because in M15 grade concrete cement contents are very low as well as strength is very low 15 N/ in 28 days and just 10 N/Sqmm in 7 days. therefore these low strengths type concrete is generally not using for Columns, Slab, Beam, Footing, Wall, etc. Sometimes this is using with reinforced in road work also in a rural area, as well as some private companies are trying to use M15 ...

    Get Price
  • How much cement sand aggregate required for M15 concrete ...

    Ans. : 112 kgs sand 215 kgs aggregate are required per 50 kg of cement bag for m15 grade of concrete. Volume of sand aggregate required for 50 kg cement bag for M15 grade of concrete. As we find bags of cement,20 cft sand 39 cft aggregate for 1 cubic metre of m15 grade of concrete. Hance bags cement = 20 sand

    Get Price
  • How to calculate cement sand and aggregate quantity in m15 ...

    What is m15 grade of concrete?:in m15 grade of concrete M stand for mix and numerical figure 15 is stand for comprehensive strength of concrete which is gain in 28 days of curing time. m15 concrete ratio in 1 m3: m15 concrete ratio in 1 cubic metre is mixture of cement, sand and aggregate by adding water. cement sand aggregate ratio in m15 grade 1m3 concrete is 1 : 2 :4 in which one part ...

    Get Price
  • M15 Concrete Material Consumption

    Reinforced cement concrete or RCC calculator can be used to calculate M15 M20 and M25 mix ratio of cement sand and jelly. At you can also. Civil Work Concrete Grade M5 148 M10 136 M15. Oct 20 2014 concrete grade m5 148 m10 136 m15 124 m20 m25 112 clear cover to main reinforcement 50 mm .

    Get Price
  • Grade Of Concrete And Their Type Of Grade

    Types of grade. Materials are mixed in specific proportions to obtain the required strength. The strength of the mix is specified as M5, M10, M15, M20, M25, M30, etc, where M signifies Mix and 5, 10, 15, etc. as their strength in kN/m the United States, concrete strength is .

    Get Price
  • Concrete Mix Design Calculation for M15 Grade as per IS ...

    But from table 5 of IS, Minimum cement content required for moderate exposure condition for M15 grade concrete is = 240 Kg/m 3 of concrete. Greater of above two values will be the cement content. Hence, C = Step 6: Aggregate Ratio for Concrete. From the table, ratio of volume of coarse aggregate to volume of total aggregate, for 20mm nominal maximum size aggregate and zone .

    Get Price
  • cement consumption for m15 concrete

    Home > cement consumption for m15 concrete. PPC/OPC Cement Difference Between Pozzolana • Almost negligible chloride content results in restraining corrosion of concrete structure in hostile environments. • Significant saving in cement consumption while making concrete of grades M15, M20, M25, M35 and precast segments due to high strength. More + Civil Work CONCRETE GRADE: M5 = .

    Get Price
  • Calculation of the M15 grade concrete cement, sand ...

    Yes, that was specifically discouraged by the Soviet leader Nikita Khrushchev. He has said that the Soviet Union should focus solely on building more housing...

    Get Price
  • material required for m15 cement concrete

    For cement Qty = /7= Cum of cement required to prepare 1Cum of M15 cement is always taken in. Go to Product Center. material quantity for m30 concreteconcrete crusher and ..., how much material required in m15 grade concrete mix ... material consumption in m15 grade cement concrete ... Go to Product Center

    Get Price
  • material required for m15 concrete for 1 cubic meter ...

     · M15 2,, M20, M15, M10 1 Trial W/C Required . per m3 of Concrete . of materials per Cubic meter Cement . for 1 cubic meter of Concrete . 0 . » More detailed

    Get Price
  • cement consumption m15 grade concrete

    M15 grade concrete can be achieved with W/C much greater than if 43 and 53 grades of cement are used and since 33grade cement has now virtually disappeared from the market. All M15 grade concrete structures in coastal areas are therefore bound to be a happy hunting ground for concrete rehabilitation agencies as is being observed at present.

    Get Price
  • Calculating the quantity of materials in 100 cu ft. 1 ...

     · = volume of cement × b = 22 cu ft. × 2 = 44 cu ft. 3. Volume of aggregates = volume of cement × c = 22 cu ft. × 4 = 88 cu ft. Quantity of materials in 1 cum of M15 (1:2:4) mix concrete: As you know, 1 cum. = cu ft. So, multiplying the abovederived quantity of cement in cum. with ( cu ft ÷ 100 cu ft. ), we will get, 1 ...